Annual Dirt to Black (FY 25-26)

Closed August 21, 2025, 01:30 PM

Last modified date October 06, 2025, 09:50 AM

  • Reference number2423327
  • StatusCanceled
  • SummaryNo specholder list available.

This project has been canceled until further notice and all bids were officially rejected at the September 17th Board of Supervisors meeting.


     (REVISED July 29th, 2025) The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for the paving of Pinion Place and Chisolm Trail in Prescott, Arizona; all in accordance with the plans, specifications, and contract documents. The project length of Pinion Place is 1,402 feet. The main line road runs north to south from the intersection of Emerald Trail and Overland Road and the side street runs east to west. Major project work includes approximately 1,182 cubic yards of roadway excavation; 3,799 square yards of subgrade preparation, 698 tons of asphaltic concrete (3-inch thick mat); 843 cubic yards of aggregate base material, and 2 water valve adjustments. Other associated work includes pavement matches, and sign base installations. The project length of Chisolm Trail is 1,334 feet with 1,134 linear feet of new asphalt concrete pavement. Major project work includes approximately 1,796 cubic yards of roadway excavation, 2,210 square yards of subgrade preparation, 415 tons of asphaltic concrete (3-inch thick mat); 497 cubic yards of aggregate base material, and 412.5 feet of new MGS guardrail with 8’ long steel posts and 4 MSKT Test Level-2 end treatments. Other associated work includes pavement matches, flexible delineator installations, a driveway culvert installation, and sign base installations. A traffic control plan and a SWPPP shall be proposed and implemented during construction. All work is to be done in accordance with the plans, specifications, and contract documents.

     There has been a MANDATORY pre-bid meeting scheduled for 9:00 a.m., Tuesday, August 5, 2025, hosted by Yavapai County Public Works through an online virtual meeting portal.  Detailed meeting instructions will be included in the contract documents.  Any questions or concerns about the project will be addressed at that time.

REVISED ENGINEER'S ESTIMATE: $624,603.25

ENGINEER'S ESTIMATE: $616,005.79

Project Files

BID TAB - Annual Dirt to Black (FY 25-26) 2423327(PDF, 88KB)

Sign-In Sheet for Mandatory Pre-Bid Meeting 2423327(PDF, 97KB)

Part A - Project Documents

Instructions for Bidding 2423327(PDF, 129KB)

Instructions for Mandatory Pre-Bid Meeting 2423327(PDF, 185KB)

Project Provisions and Specifications 2423327(PDF, 3MB)

Part B - Project Plan Set

Annual Dirt to Black (FY 25-26) Plan Set 2423327 - Revised August 19, 2025(PDF, 13MB)

Part C - Bidding Documents

Envelope #1 - This sealed envelope shall contain the following items: Completed and signed Proposal, Surety Bid Bond, Affidavit of Non-collusion, Subcontracting Certification, Addenda (if any), and sealed Envelope #2.

C.1 - Contract Documents

Required documents to be completed and signed.

Proposal 2423327(PDF, 110KB)

Surety Bid Bond 2423327(PDF, 121KB)

Affidavit of No Collusion 2423327(PDF, 87KB)

Subcontracting Certification 2423327(PDF, 93KB)

C.2 - Addenda

Addendum 1 2423327(PDF, 160KB)

Addendum 2 2423327(PDF, 331KB)

C.3 - Envelope #2

Required document to be completed and signed.

Bid Schedule 2423327 - Revised August 19, 2025(PDF, 117KB)